Skip to main content Skip to home page
Hero Placeholder
WGH Heart Logo

September 16 Medical Office Building Updates

9/16/2021
Landscaping was removed around the south side of the existing Ortho building. The construction crew has started demolition of stone wainscot on the south wall to begin the moisture damage repair.

Drywall is being hung at the medical office building.

There will be a brief closure of the main drive-through hospital canopy tomorrow morning. Patients will still be able to use the main doors.

Ultrasound and bone density moved to the current gift shop. These services will stay in that area until the new radiology area is open in December.

The main parking lot is back open.

The Cafeteria will serve its last hot meal this Sunday, September 19. It will be closed for a remodel.
 
Sort by: Name Date Size
241237926_47678...
Size: 915 kB
Uploaded: 9/20/2021
241240495_47678...
Size: 642 kB
Uploaded: 9/20/2021
241349434_47678...
Size: 777 kB
Uploaded: 9/20/2021
241430239_47678...
Size: 1.2 MB
Uploaded: 9/20/2021
241430955_47678...
Size: 776 kB
Uploaded: 9/20/2021
Wabash General Hospital logo
Back to top