July 29 Medical Office Building Updates

7/29/2021
Many updates have taken place on the addition at our Orthopaedic location. The employee parking lot will be available August 9. The roof will be placed on the addition next week. All exterior walls are in place and have been sheathed as well as one interior wall.

Workers are installing light-gauge framing in the position of a sub-fascia at the main entrance canopy.

Drain work is still ongoing inside the hospital. Please continue to look for signs or ask an employee for directions. Don't forget to utilize our shuttle service by calling 618-263-8682.
 
Sort by: Name Date Size
223475061_46195...
Size: 756 kB
Uploaded: 9/15/2021
226848986_46195...
Size: 829 kB
Uploaded: 9/15/2021
227479457_46195...
Size: 870 kB
Uploaded: 9/15/2021
228062437_46195...
Size: 663 kB
Uploaded: 9/15/2021
228367044_46195...
Size: 1 MB
Uploaded: 9/15/2021
229065350_46195...
Size: 981 kB
Uploaded: 9/15/2021
Wabash General Hospital logo
Back to top